Incessant rains followed by landslides have completely cut-off the road between Tuensang and Longleng at Namchu nullah, 12 kilometres away from Tuensang.
The road which has become non-motorable is the life line that connects the two districts of Tuensang and Longleng.
PWD (R&B) officials led by Addl. CE, Er. SN Meren along with EE Ahoto Sema, SDO Er. Thrimhokiu, J.E. Gopi and SO Thamtham inspected the affected areas on July 7.
The team had to walk for almost 3 kms to reach the major landslide area due to non-motorable conditions of the road. The officials also found minor landslides in various pockets along the state highway.
![]() |
Pic: Tunesang-Longleng lifeline cut-off due to heavy downpour and landslide. |
The road which has become non-motorable is the life line that connects the two districts of Tuensang and Longleng.
PWD (R&B) officials led by Addl. CE, Er. SN Meren along with EE Ahoto Sema, SDO Er. Thrimhokiu, J.E. Gopi and SO Thamtham inspected the affected areas on July 7.
The team had to walk for almost 3 kms to reach the major landslide area due to non-motorable conditions of the road. The officials also found minor landslides in various pockets along the state highway.
No comments:
Post a Comment